Flat pricingNo per-door feeNo sales call
All articles
Operations Sep 3, 2026 8 min read

Property Turnover Checklist — From Vacancy to Leased in 14 Days

14-day property turnover workflow: move-out inspection, make-ready scope, listing prep, showings, application screening — every day mapped, with checklist and cost benchmarks.

The hidden cost of a slow turnover isn't the vacancy — it's the days of full make-ready running in series instead of parallel. The PMs hitting 14-day turnovers do paint and flooring on day 3-4, not day 8-9. Sequence beats speed.

Every day a unit sits vacant after move-out costs you (or your owner) one day of rent. At $2,400/month rent, that's $80/day. A 30-day turnover costs $2,400; a 14-day turnover costs $1,120. The $1,280 delta is what separates portfolios that quietly earn from portfolios that quietly bleed. Below is the day-by-day workflow, the make-ready cost benchmarks, and the listing tactics that get applications in week two.

The 14-day turnover timeline

This workflow assumes a standard residential unit (2BR, decent condition at move-out) with no major repairs needed. Add 3-7 days for paint-everything jobs, 5-10 days for flooring replacement, 10-14 days for kitchen or bathroom work.

Day 0 — Move-out day

  • Tenant returns keys and final walk-through complete
  • Move-out inspection report finalized (see the move-out inspection guide)
  • Photo set complete (40-60 photos for standard 2BR)
  • Re-key the unit or rotate smart lock codes — same day, always
  • Initial scope list drafted: cleaning, paint, flooring, repairs

Day 1 — Scope confirmation and dispatch

  • Walk the unit again alone with the scope list (fresh eyes catch what you missed yesterday)
  • Confirm make-ready scope with owner if any item exceeds the pre-approved threshold
  • Dispatch cleaners (typically 4-8 hours for a 2BR; cost $200-$400 depending on condition)
  • Order any long-lead items (custom blinds, special-order appliances)
  • Schedule painter for day 3-4
  • Schedule any flooring work for day 3-5

Day 2 — Cleaning complete, repair triage

  • Cleaners finish and report any damage they discovered
  • Walk through with handyman to scope small repairs (drywall patches, caulk, hardware)
  • List ready to draft (see listing section)
  • Photograph the cleaned unit for the listing — natural light, late morning

Day 3-5 — Make-ready execution (parallel)

  • Paint touchups or full repaint (paint a full standard 2BR: 1.5-2 days, $800-$1,800 depending on coverage)
  • Handyman repairs (drywall patches, hardware, hinges, GFCI replacements, smoke detectors)
  • Flooring work if needed (carpet replacement 1-2 days, refinish 3-5 days)
  • HVAC filter, smoke/CO detector batteries, light bulbs replaced
  • Caulk in bathrooms and kitchen refreshed
  • Final cleaning if paint or flooring was done

The trap most PMs fall into: sequencing these instead of running them in parallel where possible. Paint, repair, and flooring teams can coexist in a unit if they coordinate room sequencing. Eight days serial becomes four days parallel.

Day 5-6 — Listing live

  • Final professional or pro-quality photos (10-20 photos; wide shots, full rooms, kitchen and bathroom highlights)
  • Listing copy written (see section below)
  • Listing syndicated to Zillow, Apartments.com, Trulia, Rent.com, your own site
  • Showing instructions set up (self-tour or scheduled, depending on policy)
  • Application link active

Day 6-10 — Showings and applications

  • Daily check of inquiry volume and showing requests
  • Showings booked in 30-minute back-to-back blocks where possible
  • Applications come in — start screening within 4 business hours
  • Track listing performance: views per day, leads per day, lead-to-tour conversion

Day 10-12 — Tenant selected and approved

  • Screening complete (credit, criminal, eviction, income, prior landlords)
  • Approval issued or adverse action notice sent
  • Lease drafted and sent for e-signature
  • Move-in funds invoice issued

Day 12-14 — Lease executed and move-in scheduled

  • Lease fully executed
  • Move-in funds clear (wait for clearance before key release — see the tenant onboarding workflow)
  • Move-in inspection scheduled
  • Welcome packet sent
  • Keys handed over on agreed move-in date

The make-ready scope checklist

Use this room-by-room every turnover. The unit doesn't get listed until every item is OK.

EXTERIOR / ENTRY (5 items)

  • Front door cleaned, hardware functioning, deadbolt re-keyed
  • Doorbell working
  • Address numbers visible
  • Walkway clear and clean
  • Mailbox cleared, key tested

KITCHEN (10 items)

  • All appliances cleaned inside and out (oven, microwave, fridge, dishwasher, range hood)
  • Cabinet interiors wiped, hinges and pulls operational
  • Countertops cleaned, no stains or burns
  • Sink and faucet polished, drains clear
  • Backsplash clean
  • Garbage disposal operational (3-second test)
  • All cabinets and drawers open/close fully
  • GFCI outlets test pass
  • Floor cleaned (mop hard surface, steam carpet)
  • Light fixtures cleaned, all bulbs working

BATHROOMS (8 items each)

  • Toilet cleaned and operational (no run, no leak)
  • Tub/shower scrubbed, caulk and grout intact
  • Shower head/handle functional
  • Sink, faucet, drain operational
  • Vanity interior cleaned
  • Mirror clean
  • Exhaust fan working
  • Floor cleaned

LIVING / BEDROOMS (5 items per room)

  • Walls clean, holes patched and painted
  • Floor cleaned (carpet steamed if applicable)
  • Windows clean inside and out (or marked as exterior-clean-pending)
  • Window coverings clean and functional
  • Light fixtures, outlets, switches operational

MECHANICAL (7 items)

  • HVAC filter replaced (date the new one)
  • HVAC tested (cool and heat both run)
  • Water heater operational, no leaks
  • All faucets run hot within 60 seconds
  • Smoke detectors tested (every floor + every bedroom)
  • CO detectors tested (every floor with fuel-burning appliance)
  • Electrical panel labeled, no double-tapped breakers

WALK-AROUND (5 items)

  • All keys collected and re-keyed
  • Garage opener tested (if applicable)
  • Lawn mowed, beds weeded
  • Trash and recycling bins clean
  • Final walk with checklist: every room rated OK

Make-ready cost benchmarks (2026)

Cost per turnover varies wildly by market, but these are common ranges for a standard residential 2BR. Use them to sanity-check vendor quotes and to set owner expectations.

ItemTypical cost rangeNotes
Standard cleaning (2BR, ~1000 sqft)$200-$400More for heavy-condition units
Deep cleaning (post-eviction or heavy soil)$400-$800Often a different vendor
Carpet cleaning (steam)$150-$3002-3 rooms
Carpet replacement$1,200-$2,500Mid-grade, full unit
Paint touch-ups$200-$500Same color, no patch work
Full repaint (one-color, walls only)$800-$1,800Standard 2BR
Drywall repair (5-10 nail holes)$100-$200Often bundled with paint
GFCI outlet replacement (each)$40-$80Some states require licensed electrician
Smoke / CO detector replacement (each)$30-$80Battery vs hardwired vs combo
Locksmith re-key (3-5 locks)$100-$200Or rotate smart lock codes for $0
HVAC filter$15-$40DIY
Standard handyman (per hour)$60-$100Most turnovers: 4-8 hours

A typical standard 2BR turnover (no flooring replacement, minor paint) lands at $700-$1,400 total make-ready. Add $1,500-$2,500 for full repaint + carpet replacement.

Listing copy that gets showings booked

The listing is your funnel. Bad listing copy means low view-to-lead conversion, which means longer days on market.

Listing copy structure:

  1. Headline: unit address or neighborhood + bed/bath + a single differentiator ("Renovated 2BR in Lincoln Park — In-unit Laundry, Parking")
  2. Lead paragraph: what the renter actually wants to know — rent, deposit, lease term, available date, pet policy
  3. Features list: bulleted, scannable — appliances, included utilities, parking, square footage
  4. Neighborhood / location: walkable, transit, parks, schools (if applicable) — concrete, not "great area"
  5. How to apply: showing link or self-tour code, application URL, contact info

Photo discipline for listings:

  • 10-20 photos minimum
  • Each room photographed wide-angle (24mm equivalent) from the doorway
  • Natural light only — late morning or early afternoon
  • No clutter, no people, no pets in the photos
  • Kitchen and bathroom get 2-3 photos each
  • Exterior front shot
  • One amenity photo (laundry, parking, view)

For deeper listing tactics, see how to write rental listings that convert.

What goes wrong

1. Make-ready scope running in series instead of parallel. Cleaning, paint, flooring, and handyman can overlap with good sequencing. Sequential scheduling adds a week.

2. Listing without final photos. A listing with placeholder photos or photos that don't match the cleaned unit gets fewer leads and more "this looks different in person" complaints at showing.

3. Re-keying skipped. Old keys are still in circulation with the previous tenant's contacts. This is the easiest, fastest, most-skipped step.

4. No move-in inspection scheduled before key handover. Creates the same deposit dispute risk at the next move-out. Bake it into the schedule.

5. Underpriced unit because owner wanted "competitive" rent. Underpricing means more applications but more bad applications. A well-priced unit with a 14-day turnover beats an underpriced unit with 7-day turnover and a bad tenant.

6. Skipping the walk-around with fresh eyes. Day 1 walk-through with the day-0 brain misses things. Walk again on day 1 alone.

FAQ

What's a realistic turnover time for a standard unit? With parallel scheduling and a reliable vendor bench: 10-14 days. With sequential scheduling or vendor delays: 21-30. Anything past 30 is a process problem, not a market problem.

Should I list the unit before make-ready is done? Yes — list as soon as the unit is photo-ready, even if final touch-ups are scheduled. Showings start in days 6-7, so the listing needs to be up by then. Just be clear with applicants about move-in date.

Can I show the unit while it's still being made ready? Generally no. Renters see clutter, paint smell, and unfinished work and walk away. Wait until the unit is photo-ready, then show.

How much should I budget per turnover annually? Industry benchmarks: budget $1,000-$2,000 per unit per year for turnover costs, smoothed across the portfolio. Some units don't turn for years; others turn annually. Smoothing keeps owner financials predictable.


Run mixed portfolios? Try Proprietio free for 15 days — residential, condo, and commercial in one workspace, no per-door fees. proprietio.com

Take the next step

15-day free trial. No credit card. CSV migration in 30 minutes.

See accounting features